LNG, LPG Terminal,Storages

 

 

We have 30 years of experience in the design, procurement and construction of cryogenic storage facilities for liquefied gases. Since our entry in the LNG Terminal business in 2001 our services and solutions for export and import terminals for Liquefied Natural Gas are geared to accommodate the increasing worldwide demands for clean energy. BJN has designed and installed 3 Million m³ of LNG storage, over 13 MMTPA of LNG Regasification capacity and over 3 MMTPA Small-Mid Scale LNG production capacity.

Based on experience

Consultancy Technical and Commercial Feasibility Studies Site Selection Conceptual Design Environmental Impact Assessment (EIA) and HAZOP Studies Capital Cost (CAPEX) and Operating Cost (OPEX) Estimation Business Plan for Capital Investments and Operations Basic Engineering and Front End Engineering Design (FEED) Detailed EngineeringÜberschrift

Das Schönste an diesem Text ist, was Sie daraus machen!

 

 

Procurement / Procurement Services Construction / Construction Services Supervision Services Pre- Commissioning and Commissioning Services Start- up / Shut- down Services Selection & Training of Operators Operation and Maintenance Services Life – Cycle Engineering Studies & Plant Life – Cycle Optimisation

Das Schönste an diesem Text ist, was Sie daraus machen!

 

 

 

 

 

Druckversion | Sitemap
BJN Engineering, Procurement and Construction GmbH group operating worldwide